New factory : workers and production notices
(For reference only)
I.Staff arrangement on the whole production line:
1. Great master : 1 people(24h)
2. Three machines need two boot master(Double-shift work)
3. crusher loading:2 people(Double-shift work)
Stacking and packing:10 people(Double-shift work,each shift need four people)
二.Comparison of production :
Examle 1: cup diameter is 52mm,32 modulus/min,24h/day
Scheme 1:
Mould table 720*420,36 cavities/modulu
production:36cavities*32modulus/min*60min*24 h=1658880
Scheme 2:
Mould table 700*360,26 cavities/modulu
production:26cavities*32modulus/min*60min*24h=1195080
Examle 2: cup diameter is 62mm,32 modulus/min,24h/day
Scheme 1:
Mould table 720*420,32 cavities/modulu
production:32cavities*32modulus/ min*60min*24h=1474560
Scheme 2:
Mould table 700*360 23 cavities/modulu
Production:23cavities*32modulus/min*60min*24h=1059840
Cup diameter |
700*360 Mould table production(per day) |
720*420mould table production(per day) |
52mm |
1195080 (26 cavities/modulu) |
1658880 (36 cavities/modulu) |
62mm |
1059840 (23 cavities/modulu) |
1474560 (32 cavities/modulu) |
New Factory Notices :Water,Electricity,Gas
Based on :
720II Cup Making Machine 2 set
110-900 Sheet Extruding Machine 1set
Other complete assist machines
Factory area:200 ㎡
Electricity:
transformer:≥250KW
total open space: ≥600A
aerial cable:total cable 120㎡,copper wire
cup making machine:50㎡,copper wire /set
sheet extruding machine:50㎡,copper wire /set
null line :50㎡,copper wire /set
Water:
water pipe diameter:4
Sheet extruding machine:three roles with three inlet/outlet、gear reducer with one inlet/outlet 、feed opening with one inlet/outlet、aisle with one inlet/outlet
Cup making machine:water pipe(1寸)
Gas:
Cup making machine:air pipe 1寸 / 4m3 /set
Sheet extruding machine:air pipe 12萬厘/set